Specialists from the municipal enterprise «SMEP» have successfully finished upgrading the traffic light system at the intersection of Segedskaya and Independence (Army).

Details of the completed work include:

  • Replacement of traditional traffic lights with LED ones
  • Installation of new switching equipment
  • Comprehensive technical maintenance of the traffic light system
  • Installation of a powerful uninterruptible power supply
  • Replacement of all electrical wiring

The traffic light system is operating normally.

4441 image for slide
4442 image for slide
4443 image for slide
4444 image for slide
4445 image for slide